Franco-Nevada

NuevaUnión (Relincho) (Cu, Mo)

Location: Chile, Latin America
Operator: Teck Resources Limited
Royalty: NSR: 1.5%

Franco-Nevada has a 1.5% NSR royalty covering the Relincho property that is part of the NuevaUnión project being advanced by 50/50 joint venture partners, Teck and Goldcorp Inc. (“Goldcorp”). The NuevaUnión project combines Teck’s Relincho project with Goldcorp’s La Fortuna deposit, located approximately 40 km apart in the Atacama region of Chile. The 1.5% NSR is subject to a maximum price of $6.00/lb copper and threshold price of $1.50/lb copper, inflation adjusted. No royalty is paid if the average price for the quarter is less than the threshold price and royalty payments commence four years after commercial production. Franco-Nevada acquired the royalty through its acquisition of Lumina Royalty Corp. in December 2011.

NuevaUnión is one of the largest undeveloped copper-gold-molybdenum projects in the Americas. A prefeasibility study was completed in the first quarter of 2018 which incorporates key design changes to improve project economics and respond to community and Indigenous peoples input versus the prior preliminary economic assessment. The prefeasibility study assumes an increased mine life from 32 to 36 years which does not include 205 million tonnes of Inferred Mineral Resources contained within the current pit designs.

The three phase development approach assumes life of mine average production of 251,000 tonnes of copper equivalent production based on $10 per pound molybdenum and $1,300 per ounce gold. By combining the two projects, there will be significant reductions to infrastructure requirements and thus initial capital, including utilizing a single desalination plant, a single port, a single transmission line, a single concentrator and a common tailings facility. The Relincho and La Fortuna deposits will be bulk open-pit mining operations that will be developed in three production phases. Phase 1 (years 1 - 3) sees mining and processing facilities at the Relincho site assuming processing of 104,000 tonnes per day (“tpd”). In Phase 2 (years 4 - 18), mining activities transfer to the La Fortuna site utilizing an ore conveyance system to transport ore to the processing facilities at Relincho (116,000 tpd in Phase 2). Phase 3 (years 19 - 36) sees mining activities transfer back to Relincho with an expansion to the processing facilities increasing processing to 208,000 tpd.

NuevaUnión is now focused on advancing a feasibility study, which commenced in the third quarter of 2018 and is anticipated to be completed in late 2019. This involves continued work with the local communities as well as preparing to submit an Environmental Impact Assessment to the regulatory authorities in the second half of 2019.

ASSET HIGHLIGHTS:

  • Joint Venture established with Goldcorp to combine Relincho and El Morro into one development project
  • Project synergies estimated to significantly reduce initial capital
  • Prefeasibility completed in 2018; feasibility study expected by the end of 2019

2018 2017 2016
Revenue to Franco-Nevada ($ million) $ - $ - $ -